You want to know how you can install 1MW a day?
Nothing easier than that: with the Galaxy Energy Quick Click system from Germany!
This system is cheaper, requires less material than conventional design and is faster to execute. With only 2 people you can build up the complete mounting system and the modules in less than 5 minutes. Ramming the poles, inserting the PV modules, plugin the module structure, placing the PV modules in the respective rows and fixing it with the clip.
NEVER BEEN EASIER TO INSTALL PHOTOVOLTAIC SYSTEMS!
nice work
What are the specs for wind, snow capacity load, and hurricane grade? How much would it cost to install a 20MW ground system?